Construction administration services that keep projects on track from groundbreaking to closeout. RFI responses, shop drawing review, field inspections, and engineer-of-record certifications, delivered by the same engineering team that designed the project.
Construction phase engineering is where most projects hit unexpected problems. Field conditions don't match the survey. A utility conflict shows up that wasn't on the existing drawings. A contractor proposes a substitution that changes the hydraulics. When these things happen, you need the engineer who designed the project, not a handoff to someone who has to reconstruct the design intent from scratch.
We provide construction phase services as a continuation of our design work. The engineer who sealed your plans is the same engineer responding to RFIs, reviewing shop drawings, and signing the final certifications. That continuity protects schedules, budgets, and the engineering record.
Attendance at pre-con meetings to walk contractors through critical design intent, clarify unusual details, and identify likely coordination challenges before ground breaks.
Fast, substantive responses to contractor Requests for Information, with clear direction, supporting calculations, and markup where needed.
Thorough review of contractor and supplier shop drawings for conformance with design intent, specifications, and code requirements.
Periodic field inspections at key construction milestones, subgrade, utility installation, stormwater control measures, pavement, and final walkthrough.
Engineering review of proposed change orders, substitution requests, and field modifications for cost, schedule, and design integrity impact.
Review of contractor as-built survey data, verifying constructed conditions match design and documenting any field modifications for the final record set.
Final engineer-of-record certifications for stormwater SCMs, erosion control, site drainage, and any other elements requiring PE certification for closeout.
Proactive schedule coordination with contractors and owners, identifying review bottlenecks, permit milestones, and critical path items before they become delays.
Coordination of final permit closeout, certificate of occupancy support, stormwater maintenance agreements, and warranty record documentation.